RFID NEWS

RFID Process ownership from factory to distribution center

Vendor compliance fails when everyone assumes someone else issued the serial, verified the barcode or corrected the SSCC. A practical RACI model assigns one accountable owner for each gate while allowing shared execution.

Stage

Accountable for

Must hand over

Brand / supplier program owner

Retailer specification and business rules

Current retailer document set, SKU matrix and exception policy

ERP / PLM owner

Product master and order data

Valid GTIN, style/color/size, PO and pack rules

Serialization service

Unique EPC and SSCC issuance

Allocated ranges, issuance log and reconciliation report

Label converter

Inlay supply and finished-label quality

Material certificate, print spec and finished-label samples

Factory / packer

Tag application and case packing

Application work instruction, SSCC and aggregation records

3PL / DC

Receiving verification and shipment data

ASN, receipt discrepancies and disposition

Retailer

Receiving-site equipment and documented acceptance

Read requirements, dock rules and escalation contacts

Factory encoding is the preferred control point because it catches problems closest to the source. A blank chip leaving the encoding station, a misprinted UPC or a duplicated serial can be corrected before thousands of units are packed. The trade-off is that factory printers need reliable connectivity, secure credential handling, maintenance, operator training and a clear restart protocol after a paper jam or power loss. If an outage occurs, stop and reconcile; never let a line keep shipping while the serialization server is unavailable.

The packer owns the physical hierarchy; the WMS owner owns the digital hierarchy. These two records must agree. When a packer opens a case and removes units, the system must update the aggregation before the case is sealed. When cases are restacked, the pallet SSCC must be decommissioned or re-associated. When a shipment short-picks, the ASN must be corrected before the truck departs. A reader that only counts tags cannot judge these relationships by itself.

A 3PL may operate the DC, but it should not become the sole keeper of encoding rules unless the contract explicitly transfers that responsibility. The retailer typically owns the receiving-side acceptance threshold and may operate a chargeback policy, but the brand remains responsible for the data it commissions. Contracts should allocate costs and liabilities for label supply, application, printer failure, SSCC administration, damaged tickets, rework, reshipping and non-compliance.


CATEGORIES

CONTACT US

Contact: Adam

Phone: +86 18205991243

E-mail: sale1@rfid-life.com

Add: No.987,Innovation Park,Huli District,Xiamen,China

Scan the qr codeclose
the qr code